Ansicht
Dokumentation
CPA57EA - Contact not successful on controller &24. LPDA test in progress. (C R) ( OS/400 )
CPI1466 during Backup rdisp/max_wprun_time - Maximum work process run timeThis documentation is copyright by IBM.
Message : CPA57EA
Contact not successful on controller &24. LPDA test in progress. (C R)
Message Long Text :
Cause . . . . . : The system could not contact controller &24 on line &23 because a link problem determination aid (LPDA) test is being performed on the line, and the role (ROLE parameter) of the line description is *SEC or *NEG.
Recovery . . . : Wait until the LPDA test is complete, then try the request again.
If the problem continues, report the problem (ANZPRB command).
Possible choices for replying to message . . . . . . . . . . . . . . . :
C -- Cancel recovery and inform any applications that are waiting for an operation that the recovery has been canceled.
R -- Try the operation one more time.
Technical description . . . . . . . . : The error log identifier is &22.
The error code is &40: LPDA test in progress.
Message File : QCPFMSG
Library Message File : QSYS2924
General Material Data General Material Data
This documentation is copyright by IBM.
Length: 3264 Date: 20240425 Time: 015302 sap01-206 ( 3 ms )