Ansicht
Dokumentation

CPA587B - Controller &24 contact not successful. (C R) ( OS/400 )

CPA587B - Controller &24 contact not successful. (C R) ( OS/400 )

ABAP Short Reference   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by IBM.
SAP E-Book


Message : CPA587B
Controller &24 contact not successful. (C R)

Message Long Text :

Cause . . . . . : The local system did not send an X.25 call out request for controller &24 on line &23 because the facility field length exceeds the maximum allowed (109 bytes).
Recovery . . . : The total length of the facilities encoded by the local system on a given X.25 call out request is determined by the following configuration parameters:
-- Length of value specified in the user facility (USRFCL) parameter for controller &24.
-- Length of value specified plus two in the network user identifier (NETUSRID) parameter for line &23.
-- If the value specified in the default packet size (DFTPKTSIZE) parameter for controller &24 is not *LIND, and is different from that specified in the default packet size (DFTPKTSIZE) parameter for line &23, then three bytes are added for this facility.
-- If the value specified in the default window size (DFTWDWSIZE) parameter for controller &24 is not *LIND, and is different from that specified in the default window size (DFTWDWSIZE) parameter for line &23, then three bytes are added for this facility.
-- If a value is specified in the user group identifier (USRGRPID) parameter for controller &24, then two bytes are added for this facility.
-- If a value other than *NONE is specified in the X.25 reverse charging (RVSCRG) parameter for controller &24, then two bytes are added for this facility.
Change one or more of the above parameters to reduce the total length of the facility field to less than or equal to 109 bytes.
Possible choices for replying to message . . . . . . . . . . . . . . . :
C -- Cancel recovery and inform any applications and subsystems that are waiting for an operation that the recovery has been canceled.
R -- Try the operation one more time.
Technical description . . . . . . . . : The error log identifier is &22.
The error code is &40: Facility field exceeded the maximum length allowed (109 bytes) by CCITT Recommendation X.25 and ISO 8208.

Message File : QCPFMSG
Library Message File : QSYS2924


SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up   General Material Data  
This documentation is copyright by IBM.

Length: 3250 Date: 20240419 Time: 080608     sap01-206 ( 2 ms )