Ansicht
Dokumentation

CPA59DB - Controller &24 contact not successful. Remote system problem. (C R) ( OS/400 )

CPA59DB - Controller &24 contact not successful. Remote system problem. (C R) ( OS/400 )

General Data in Customer Master   PERFORM Short Reference  
This documentation is copyright by IBM.
SAP E-Book


Message : CPA59DB
Controller &24 contact not successful. Remote system problem. (C R)

Message Long Text :

Cause . . . . . : The system is trying to communicate with a station; however, the remote station sent a data frame that is too large. This is a protocol error caused by the remote controller sending a data frame that was too large. The data sent was not received.
Recovery . . . : Contact the remote station operator and verify the station configuration, particularly the maximum frame size (MAXFRAME parameter).
If the problem continues, report the problem (ANZPRB command).
Possible choices for replying to message . . . . . . . . . . . . . . . :
C -- Cancel recovery and inform any applications that are waiting for an operation that the recovery has been canceled.
R -- Try the operation one more time.
Technical description . . . . . . . . : The error log identifier is &22.
The error code is &40: The error is a frame reject and the logical link has been disconnected. The remote system sent a frame that is larger than the maximum LPDU size.

Message File : QCPFMSG
Library Message File : QSYS2924


Addresses (Business Address Services)   Addresses (Business Address Services)  
This documentation is copyright by IBM.

Length: 3261 Date: 20240419 Time: 135733     sap01-206 ( 4 ms )