Ansicht
Dokumentation

CPC2610 - Vary off completed for controller &1. ( OS/400 )

CPC2610 - Vary off completed for controller &1. ( OS/400 )

ROGBILLS - Synchronize billing plans   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by IBM.
SAP E-Book


Message : CPC2610
Vary off completed for controller &1.

Message Long Text :

Cause . . . . . : The vary configuration (VRYCFG) command was issued requesting that controller &1 be varied off.
Technical description . . . . . . . . : If ASCVRYOFF(*YES) was specified on the VRYCFG command, the status of controller &1 will be VARY OFF PENDING until controller take down is completed. If ASCVRYOFF(*NO) was specified on the VRYCFG command, controller take down is complete and the status of controller &1 is VARIED OFF.

Message File : QCPFMSG
Library Message File : QSYS2924


BAL Application Log Documentation   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by IBM.

Length: 3219 Date: 20240418 Time: 205922     sap01-206 ( 2 ms )