Ansicht
Dokumentation

/IPRO/RUN_RULE - Run Rules

/IPRO/RUN_RULE - Run Rules

CPI1466 during Backup   Addresses (Business Address Services)  
This documentation is copyright by SAP AG.
SAP E-Book

Implement this Business Add-In to determine whether a rule linked to an element should run depending on the element's inclusion status.

The Business Add-In consists of the method described below, which can be used to determine whether a rule linked to an element will run based on the element's inclusion status and the document attributes.

The following import parameters are provided:

  • IO_DOCUMENT
    Reference to the interface /IPRO/IF_DOCUMENT, which contains methods that enable you to retrieve all elements, variables and attributes of a document instance. The LOOKUP method of this interface enables you to find document attributes such as CONTENT and DOCUMENT SELECTION.
  • IS_ELMNT_ID
    Standard Element ID
  • IV_STATUS
    Inclusion status of the element. All possible values for this field are listed below:
  • 'OR'
    Optionally included via rule

  • 'OC'
    Optionally included via configuration

  • 'MR'
    Mandatory inclusion via rule

  • 'MC'
    Mandatory inclusion via configuration
    'RE' -
    Excluded by rule

  • 'US'
    Evaluate rule to determine inclusion status

  • 'RR'
    Recommended inclusion via rule

  • 'UI'
    User included

  • 'UE'
    User excluded

The return parameter RV_RUN_RULE is provided: Boolean value used to determine whether the rule for the given element should run.

After calling up the IMG activity, a dialog box appears, in which you can enter a name for the implementation.

If you have already made other implementations for this BAdI, another dialog box appears, in which the existing implementations are displayed. In this case, choose Create, and proceed as follows:

1. In the dialog box, enter a name for the BAdI implementation in the Implementation field, and choose Create.

The screen for creating BAdI implementations is now displayed.

2. Enter a short text for the implementation in the Short text for implementation field.

3. From the tab index, choose Interface.

The Name of implemented class field is already filled on the tab page, as a class name was automatically assigned to the implementation when you named it.

4. Save your entries, and assign the implementation to a development class.

5. Place the cursor on the method, and double-click to enter method processing.

6. Enter the coding for the implementation between the statements method ~ and endmethod.

7. Save and implement your coding. Return to the Edit Implementation screen.

8. Save the entries on the Edit Implementation screen.

Note: You can also create an implementation, and then activate it at a later time. In such a case, end the processing stage at this point.

9. Choose Activate.

The coding you stored in the methods will be run when the application program is executed.

For more information, see the SAP Library under Basis Components → ABAP Workbench (BC-DWB) → Changing the SAP Standard (BC)→ Business Add-Ins.






rdisp/max_wprun_time - Maximum work process run time   CPI1466 during Backup  
This documentation is copyright by SAP AG.

Length: 3987 Date: 20240329 Time: 072741     sap01-206 ( 53 ms )