Ansicht
Dokumentation
ABENMESH_PATH_RESULT_INIT_ASSOC - MESH PATH RESULT INIT ASSOC
rdisp/max_wprun_time - Maximum work process run time RFUMSV00 - Advance Return for Tax on Sales/PurchasesThis documentation is copyright by SAP AG.
- Result of the Initial Mesh Association
An initial mesh association with the syntax
...rnode\_associ[ source $[cond$] ] ...
describes a set of lines in the follow-on node of the used mesh association that meets the following conditions:
- All lines meet the ON condition of the used mesh association with respect to the specified structure source. Every tcomp column specified in the ON condition has the same content as in the scomp column of the root node in the source structure that is assigned to the ON condition.
- Depending on the mesh path usage, the set of lines can be further restricted by using additional cond conditions.
Note
The set of lines described by the result can be either one line or multiple lines.
General Material Data ABAP Short Reference
This documentation is copyright by SAP AG.
Length: 1465 Date: 20240419 Time: 094146 sap01-206 ( 22 ms )