Ansicht
Dokumentation

/PM0/ABT_SVC_NOTEREQ_PROC_READ - Output of Processing with Required Note Starting from an Effective Date

/PM0/ABT_SVC_NOTEREQ_PROC_READ - Output of Processing with Required Note Starting from an Effective Date

Vendor Master (General Section)   Vendor Master (General Section)  
This documentation is copyright by SAP AG.
SAP E-Book

Functionality

You can use this function module to determine the processing activities with required note starting from an effective date.

The behavior is not exactly the same as the Processing Activities to Be Reversed screen (such as the output of a line for Include Contract). This allows the caller to better determine whether the change to be performed is a retroactive one.

Example

When you execute the Change business process, the system positions the contracts on the specified effective date. If the effective date is before the currently valid state, all of the processing activities that were executed since the effective date will be reversed.

You can use this function module to determine these processing activities.

Notes

Input Parameters

  • If IF_INCL_EQUAL_DATE is set, the effective date will be included.
  • If IF_BACKGROUND is set, the values will be changed according to the restrictions of background processing.

No scheduled processing activities (such as BTS dates) are returned.

Further information





Parameters

ET_EXTENSIONOUT
ET_MESSAGES
ET_NOTE_REQUIRED_PROCESSING
IF_BACKGROUND
IF_INCL_EQUAL_DATE
IT_EXTENSIONIN
IV_EFFECTIVE_DT
IV_POLICYNR_TT

Exceptions

Function Group

/SAPLABT_SVC_JOURNAL

CL_GUI_FRONTEND_SERVICES - Frontend Services   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.

Length: 1625 Date: 20240425 Time: 185041     sap01-206 ( 37 ms )