/SAPAPO/HEU_PUR_PLANNING - Least Unit Cost Procedure for External Procurement

/SAPAPO/HEU_PUR_PLANNING - Least Unit Cost Procedure for External Procurement

BAL_S_LOG - Application Log: Log header data   PERFORM Short Reference  
This documentation is copyright by SAP AG.
SAP E-Book

Functionality .

Example

Notes

Further information

To simplify the algorithm, all requirements that are before the start of the heuristic, are grouped together with a requirement with the requirements date 'heuristic start' (-> no time consuming determination of 'penalty costs').

For delayed receipts, penalty costs are determined within the system (see above for exception). The unit costs for such requirements are much higher than the usual unit costs, because of these penalty costs. Thus, delayed receipts should be avoided where possible.

When determining the optimum receipt, purchase order quantities with the following characteristics, are selected:

1) Total penalty costs are as low as possible,

2) Unit costs per unit are as low as possible and

3) The purchase order quantity is as high as possible

Note: Penalty costs and unit costs are considered separately, since otherwise the result is distorted. If penalty costs occur once, the unit costs would be 'extremely' high, if they were considered together. By adding further requirements, the unit costs become increasingly lower (even with relatively high/avoidable storage costs).





Parameters

E_CHANGED_OBJECTS
E_OBJECT_KEYS
I_DIALOG_FLG
I_HEUR_SETTINGS
I_OBJECT_KEYS
I_SIMSESSID
I_SIMVERID

Exceptions

FAILED
NOT_QUALIFIED
NO_INPUT_OBJECTS

Function Group

APO/SAPLRRP_HEUR_PURWB

CL_GUI_FRONTEND_SERVICES - Frontend Services   ABAP Short Reference  
This documentation is copyright by SAP AG.

Length: 1706 Date: 20240418 Time: 161006     sap01-206 ( 42 ms )