Ansicht
Dokumentation
05507 - CPI1466 during Backup
SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3upThis documentation is copyright by SAP AG.
CPI1466 during Backup
Yes, but i have 2 sap systems ( DEV and PRO ) on 1 box, and i backup both at
same time.
Peter.
|--------+------------------------->
| | "Dieter Huber" |
| | <dieter.huberZb|
| | asycs.com> |
| | |
| | 28/03/2002 |
| | 10:16 |
| | Please respond |
| | to SAP on System i|
| | |
|--------+------------------------->
>----------------------------------------------------------------------------|
| |
| To: <DoNotReply@consolut.eu> |
| cc: |
| Subject: AW: CPI1466 during Backup |
>----------------------------------------------------------------------------|
Correct, I don't look at that number and only focussed the message-Id.
One R/3 database should only have less than 30.000 locks.
Dieter
-----Ursprüngliche Nachricht-----
Von: Gueldenpfennig, Volker [mailto:volker.gueldenpfennigZs...]
Gesendet: Donnerstag, 28. März 2002 10:13
An: 'DoNotReply@consolut.eu'
Cc: 'Peter_JacquesZp...'
Betreff: RE: CPI1466 during Backup
Sorry for the last mail-error!
Hi Peter + Dieter,
but 60000 is pretty high, because we do have only 20000 - 30000 per
R3SIDDATA. It sounds to me, that here is backuped as follows:
SAVLIB SAVACT(*SYNCLIB)
I would suggest to use the following approach:
SAVLIB SAVACT(*LIB)
Then you should only see the message about 30000 locks and it is a lot more
convinient for the system.
Regards
Volker
-----Original Message-----
From: Huber, Dieter
Sent: Donnerstag, 28. März 2002 09:49
To: DoNotReply@consolut.eu
Subject: AW: CPI1466 during Backup
Hi Peter,
don't worry about this warning.
Ignore it - it is absolute normal that this message is given by the OS
joblog if you backup the R3<SID>DATA.
Dieter Huber
**********************************************************************
-----Ursprungliche Nachricht-----
Von: Peter_JacquesZp... [mailto:Peter_JacquesZp...]
Gesendet: Donnerstag, 28. Marz 2002 09:36
An: DoNotReply@consolut.eu
Betreff: CPI1466 during Backup
Hi,
I have some problem with the backup of our system, I'm using the standard
AS/400
backup and the SAP system is stopped before
the backup is started.
The backup looks OK, but i always receive following message.
Message ID . . . . . . : CPI1466 Severity . . . . . . . : 10
Message type . . . . . : Information
Date sent . . . . . . : 28/03/02 Time sent . . . . . . : 04:49:32
Message . . . . : Job holds large number of locks.
Cause . . . . . : The job 152565/QSYSOPR/QEZBKTMTHU has 60000 locks.
60000
is a suspiciously large number of locks, and it indicates that an
application may be leaving locks behind.
Anyone knows how to solve this ??
( 60000 -> We are running DEV and PRO on 1 box, but both are stopped at
the
same time)
Thanks.
Peter Jacques.
Pioneer Technology Belgium.
Have a look to our homepage at: http://www.consolut.net
DoNotReply@consolut.eu
Your use of consolut is subject to http://www.consolut.net
Have a look to our homepage at: http://www.consolut.net
DoNotReply@consolut.eu
Your use of consolut is subject to http://www.consolut.net
Have a look to our homepage at: http://www.consolut.net
DoNotReply@consolut.eu
Your use of consolut is subject to http://www.consolut.net
consolut Sponsor
[IMAGE]
[IMAGE]
Have a look to our homepage at: http://www.consolut.net
DoNotReply@consolut.eu
Durban Tours - Südafrika Safari
General Material Data SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up
This documentation is copyright by SAP AG.
Length: 6373 Date: 20240424 Time: 202458 sap01-206 ( 3 ms )