Ansicht
Dokumentation
09100 - Antwort: How to set SAVACTWAIT with BRMS?
RFUMSV00 - Advance Return for Tax on Sales/Purchases CPI1466 during BackupThis documentation is copyright by SAP AG.
Antwort: How to set SAVACTWAIT with BRMS?
Hi Franz,
in the control group write before the database an EXIT
CHGCMDDFT CMD(SAVLIB) NEWDFT('SAVACTWAIT(7200)')
after the database entry you can reset the waittime:
CHGCMDDFT CMD(SAVLIB) NEWDFT('SAVACTWAIT(120)')
Regards,
Lutz Eilert, IM-DCT
Phone: +49 2941 38 6861
Fax: +49 2941 38 47 6861
mailto:Lutz.EilertZhella.com
"Lehnardt, Franz" An:
"SAP on System i (E-Mail)"
<franz.lehnardtZunielektro.de>
<DoNotReply@consolut.eu>
Kopie:
Blindkopie:
29.01.2003 12:58 Thema:
How to set SAVACTWAIT with
Bitte antworten an BRMS?
SAP on System i
Hi *all,
we save our R/3-Lib using BRMS with option savwhlact=*yes. Every now and
then the backup operation cancels because of pending commit-cycles for some
objects, for which the backup tried to set a sync-point at the same time.
I know, that setting the sync-point is by default waiting max. 2 minutes
for
any pending commit-cycles to complete. I also know that I can change this
timespan with param. SAVACTWAIT in SAVLIB.
But assumed that BRMS uses command SAVLIBBRM (which does NOT have a param.
named SAVACTWAIT), how can I control the waittime in this case??
Thanks for any hints!
Mit freundlichen Gruessen / Best regards,
Franz Lehnardt
AS/400 Administration
Unielektro Fachgrosshandel GmbH & Co. KG
65760 Eschborn, Germany
Tel. +49 (0) 6196 477-360
Fax +49 (0) 6196 477-776
consolut Sponsor
(Embedded image moved to file: pic31101.pcx)
(Embedded image moved to file: pic24393.pcx)
Have a look to our homepage at: http://www.consolut.net
DoNotReply@consolut.eu
[Non-text portions of this message have been removed]
Durban Tours - Südafrika Safari
General Data in Customer Master rdisp/max_wprun_time - Maximum work process run time
This documentation is copyright by SAP AG.
Length: 2925 Date: 20240419 Time: 031651 sap01-206 ( 3 ms )