Ansicht
Dokumentation
12325 - R3SETUP
ABAP Short Reference BAL Application Log DocumentationThis documentation is copyright by SAP AG.
R3SETUP
Hi,After changing dbincondb4 in lib r3setup as per Volker's suggestion the
installation moved forward and aborted
with the following error.
*********************************************************************
DbSl Trace: Init DB monitor: DBMON: missing R/3 parameter
DbSl Trace: Other error: system() command failed. Generic error (SQL0901).
DbSl Trace: Error: CHKOBJ OBJ failed.
#(IMP) ERROR: couldn't connect to DB
rc = 256
error message returned by DbSl:
#STOP: 20031212115016
#(IMP) ERROR: DbSlRollback failed
DbSlRollback: rc = 2
(SQL error 0)
*********************************************************************
I am using "r3setup '-f centrdb.r3s" to restart my install.
Any suggestions?
Thanks
Berhanu
-----Original Message-----
From: BKifle [mailto:kifleZmru.com]
Sent: Thursday, December 11, 2003 6:03 PM
To: DoNotReply@consolut.eu
Subject: Re: R3SETUP
Hi,
I was installing R3 4.5B on iSieries 810 with OS400 V5R2 (to be used as target
system for homogeneous system copy).
R3SETUP aborted with "Switch to user QSECOFR failed " error in
DBR3LOADDDIC_IND_DB4 step. I looked in OSS and
found note 370284 and used the suggested solution but the same error keeps
comeing. I appreciate your suggestion?
Thanks.
Berhanu
[Non-text portions of this message have been removed]
Have a look to our homepage at: http://www.consolut.net
DoNotReply@consolut.eu
Your use of consolut is subject to http://www.consolut.net
Durban Tours - Südafrika Safari
General Material Data Fill RESBD Structure from EBP Component Structure
This documentation is copyright by SAP AG.
Length: 2468 Date: 20240328 Time: 094741 sap01-206 ( 3 ms )