Ansicht
Dokumentation
IMI5044 - E:When cancelling a current-value, &1 is the maximum possible. ( DCW )
CPI1466 during Backup rdisp/max_wprun_time - Maximum work process run timeThis documentation is copyright by SAP AG.
Message : IMI5044
E:When cancelling a current-value, &1 is the maximum possible.
Message Long Text :
When cancelling a current-value depreciation (negative allocation), the amount &1 at most can be cancelled, which was already allocated to current-value depreciation in the same year. Current-value depreciations for earlier years may only be corrected by appreciation.
Message File : IMSG
Library Message File : DCWL03
TXBHW - Original Tax Base Amount in Local Currency General Material Data
This documentation is copyright by SAP AG.
Length: 3235 Date: 20240420 Time: 101411 sap01-206 ( 6 ms )