Ansicht
Dokumentation

MMA0441 - E:Period later than current period ( DCW )

MMA0441 - E:Period later than current period ( DCW )

SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up   ABAP Short Reference  
This documentation is copyright by SAP AG.
SAP E-Book


Message : MMA0441
E:Period later than current period

Message Long Text :
An attempt was made to enter the period &3/&4. This is not possible as this period is after the current period &1/&2. Only periods which fall before or are the same as the present period may be entered.

Message File : MMSG
Library Message File : DCWL03


General Data in Customer Master   ABAP Short Reference  
This documentation is copyright by SAP AG.

Length: 3207 Date: 20240418 Time: 204425     sap01-206 ( 2 ms )