Ansicht
Dokumentation

MMA0950 - E:Maximum contents of storage location exceeded. ( DCW )

MMA0950 - E:Maximum contents of storage location exceeded. ( DCW )

ROGBILLS - Synchronize billing plans   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.
SAP E-Book


Message : MMA0950
E:Maximum contents of storage location exceeded.

Message Long Text :
The attempt to transfer material &1 from storage location &2 to storage location &3 failed as the maximum contents would be exceeded.

Message File : MMSG
Library Message File : DCWL03


General Material Data   Vendor Master (General Section)  
This documentation is copyright by SAP AG.

Length: 3221 Date: 20240328 Time: 155936     sap01-206 ( 3 ms )