Ansicht
Dokumentation

CPA1E01 - System is scheduled to power off at &4 on &3. (G C 30-180) ( OS/400 )

CPA1E01 - System is scheduled to power off at &4 on &3. (G C 30-180) ( OS/400 )

CPI1466 during Backup   General Material Data  
This documentation is copyright by IBM.
SAP E-Book


Message : CPA1E01
System is scheduled to power off at &4 on &3. (G C 30-180)

Message Long Text :

Recovery . . . : Do one of the following:
-- Type G to go ahead and power off at &4 on &3.
-- Type C to cancel the scheduled power off.
-- Type a number from 30 through 180 to delay the scheduled power off by this number of minutes.
Possible choices for replying to message . . . . . . . . . . . . . . . :
G -- Go ahead with scheduled power off.
C -- Cancel the scheduled power off.
30-180 -- Delay the scheduled power off by the specified number of minutes.

Message File : QCPFMSG
Library Message File : QSYS2924


rdisp/max_wprun_time - Maximum work process run time   General Material Data  
This documentation is copyright by IBM.

Length: 3253 Date: 20240423 Time: 103901     sap01-206 ( 2 ms )