Ansicht
Dokumentation

CPD3B5A - SNA session for conversation &1 ended abnormally. &14 ( OS/400 )

CPD3B5A - SNA session for conversation &1 ended abnormally. &14 ( OS/400 )

ABAP Short Reference   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by IBM.
SAP E-Book


Message : CPD3B5A
SNA session for conversation &1 ended abnormally. &14

Message Long Text :

Cause . . . . . : A Systems Network Architecture (SNA) error caused the session to end abnormally. An SNA UNBIND command was sent or received.
Recovery . . . : The SNA sense data of &12 indicates the reason the session ended. For more information on sense data, see the APPN information in the Networking category in the IBM i Information Center book, http://www.ibm.com/systems/i/infocenter/, or the SNA Formats manual, GA27-3136. If the program is using commitment control and rollback is required, the logical unit of work must be rolled back. Use the rollback operation to roll back any pending changes made since the last commitment boundary. Correct the error and then restart the conversation. If the problem continues, report the problem (ANZPRB command).

Message File : QCPFMSG
Library Message File : QSYS2924


ABAP Short Reference   Vendor Master (General Section)  
This documentation is copyright by IBM.

Length: 3236 Date: 20240425 Time: 192607     sap01-206 ( 2 ms )