Ansicht
Dokumentation

CPD3B68 - Prestart job ended. ( OS/400 )

CPD3B68 - Prestart job ended. ( OS/400 )

ROGBILLS - Synchronize billing plans   Vendor Master (General Section)  
This documentation is copyright by IBM.
SAP E-Book


Message : CPD3B68
Prestart job ended.

Message Long Text :

Cause . . . . . : The prestart job that issued the Accept_Conversation (CMACCP) call ended. The conversation was not allocated. The prestart job ended for one of the following reasons:
-- The End Job (ENDJOB), End Prestart Job (ENDPJ), End Subsystem (ENDSBS), End System (ENDSYS), or Power Down System (PWRDWNSYS) command was issued.
-- The value for the maximum number of jobs (MAXJOBS) parameter for the prestart job entry was reduced by the Change Prestart Job Entry (CHGPJE) command.
-- The value for the maximum number of uses (MAXUSE) parameter was exceeded for the prestart job.
-- The prestart job ended because there are too many prestart jobs not being used.
-- A prestart job had an initialization error.
Recovery . . . : Correct the error, if necessary, and try the request again.

Message File : QCPFMSG
Library Message File : QSYS2924


CPI1466 during Backup   Addresses (Business Address Services)  
This documentation is copyright by IBM.

Length: 3211 Date: 20240424 Time: 034751     sap01-206 ( 2 ms )