Ansicht
Dokumentation

CPD70E6 - Service required on ASP &1 for access path protection. ( OS/400 )

CPD70E6 - Service required on ASP &1 for access path protection. ( OS/400 )

Vendor Master (General Section)   ROGBILLS - Synchronize billing plans  
This documentation is copyright by IBM.
SAP E-Book


Message : CPD70E6
Service required on ASP &1 for access path protection.

Message Long Text :

Cause . . . . . : An error occurred for ASP &1 during system-managed access-path protection.
If this message was received while trying to change the target access path recovery time for ASP &1, the change to the recovery time was made, but it could not become active.
Otherwise, system-managed access-path protection for ASP &1 has been ended because of an internal system problem.
System-managed access-path protection can not be used to protect access paths on ASP &1 because of an internal system problem.
Recovery . . . : Edit the access path recovery times (EDTRCYAP command) to determine if the current estimated system access path recovery time is acceptable. If it is not acceptable, change the target system recovery time.
Report the problem (ANZPRB command).

Message File : QCPFMSG
Library Message File : QSYS2924


ROGBILLS - Synchronize billing plans   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by IBM.

Length: 3244 Date: 20240329 Time: 120950     sap01-206 ( 3 ms )