Ansicht
Dokumentation

CPD83D7 - Commit operation changed to rollback. ( OS/400 )

CPD83D7 - Commit operation changed to rollback. ( OS/400 )

BAL Application Log Documentation   CPI1466 during Backup  
This documentation is copyright by IBM.
SAP E-Book


Message : CPD83D7
Commit operation changed to rollback.

Message Long Text :

Cause . . . . . : The commit operation could not complete and a rollback operation was started for one of the following reasons:
-- A resource failure occurred.
-- A remote partner voted to rollback during a two-phase commit operation.
-- A two-phase commit protocol violation occurred.
-- An application program interface (API) resource voted to rollback during a two-phase commit operation.
-- An API resource specified that it is a last agent and cannot be a last agent.
-- Invalid return information was provided by the API commitment control exit program.
-- More than one remote partner tried to be the initiator of a two-phase commit operation at the same time.
-- The commit to an unprotected remote location failed.
Recovery . . . : The changes made during this logical unit of work are being rolled back.
Display the previous messages listed in the job log (DSPJOBLOG command) to identify the problem, and then take the appropriate action.
No action is required if the reason for rolling back is a remote partner or API resource voted to rollback.
Technical description . . . . . . . . : The commitment definition identifier is &2. The activation group number is &3. The logical unit of work identifier is &4. The lock space id is &8. The lock space associated space id is &9. The XID is &10.

Message File : QCPFMSG
Library Message File : QSYS2924


ABAP Short Reference   General Material Data  
This documentation is copyright by IBM.

Length: 3241 Date: 20240418 Time: 152607     sap01-206 ( 2 ms )