Ansicht
Dokumentation

CPD8F45 - Resource name cannot be changed. ( OS/400 )

CPD8F45 - Resource name cannot be changed. ( OS/400 )

TXBHW - Original Tax Base Amount in Local Currency   BAL_S_LOG - Application Log: Log header data  
This documentation is copyright by IBM.
SAP E-Book


Message : CPD8F45
Resource name cannot be changed.

Message Long Text :

Cause . . . . . : The resource name (RSRCNAME parameter) cannot be changed from *NWID, *NWSD, or *AGG to another value, or from any other value to *NWID, *NWSD, or *AGG. Line descriptions that specify *NWID for the resource name can only be used to attach to network interface descriptions. Line descriptions that specify *NWSD for the resource name can only be used to attach to network server descriptions. Line descriptions that specify *AGG for the resource name can only be used on Ethernet Link Aggregation. Line descriptions that specify other values cannot be attached to network interface descriptions, to network server descriptions, or to an aggregate port.
Recovery . . . : Create a new line description using the desired resource name.
Technical description . . . . . . . . : When the resource name parameter is specified as *NWID, the line being configured is attached to a resource through a network interface. In this case, the line cannot be changed to attach to another resource. When the resource name parameter is specified as *NWSD, the line being configured is attached to a resource though a network server. In this case, the line cannot be changed to attach to another resource. When the resource name is specified as *AGG, the line being configured is attached to an aggregate resource. Conversely, when the resource name parameter is specified as a real resource, the line being configured is not permitted to be changed to attach to a resource through a network interface, a network server, or an aggregate resource.

Message File : QCPFMSG
Library Message File : QSYS2924


Addresses (Business Address Services)   ABAP Short Reference  
This documentation is copyright by IBM.

Length: 3216 Date: 20240420 Time: 063625     sap01-206 ( 3 ms )