Ansicht
Dokumentation

CPD9B1E - No cable attached to communications port. ( OS/400 )

CPD9B1E - No cable attached to communications port. ( OS/400 )

Addresses (Business Address Services)   General Material Data  
This documentation is copyright by IBM.
SAP E-Book


Message : CPD9B1E
No cable attached to communications port.

Message Long Text :

Cause . . . . . : The configuration cannot be made operational until a cable is attached to the communications port.
Recovery . . . : Continue configuration. When configuration is complete, use F10 (if available) or the Display Job Log (DSPJOBLOG) command to view messages in the job log. An informational message, CPI9B04, will be written in the job log to indicate the cable type required. This cable must be attached before the configuration can be used.
If you selected the option to configure remote systems using printed instructions on the Communications Configuration Tasks (CMNCFG) menu, the cable must have the physical interface specified in the printed instructions.
After the cable is attached, you must IPL the system before the cable can be used. Then use option 9 (Work with status) on this display or use the Work with Configuration Status (WRKCFGSTS) command to enter option 1 (Vary on) next to the line name on the Work with Configuration Status display.

Message File : QCPFMSG
Library Message File : QSYS2924


CPI1466 during Backup   CPI1466 during Backup  
This documentation is copyright by IBM.

Length: 3227 Date: 20240423 Time: 172506     sap01-206 ( 3 ms )