Ansicht
Dokumentation

CPI8F16 - Line &23 failed. ( OS/400 )

CPI8F16 - Line &23 failed. ( OS/400 )

Fill RESBD Structure from EBP Component Structure   BAL Application Log Documentation  
This documentation is copyright by IBM.
SAP E-Book


Message : CPI8F16
Line &23 failed.

Message Long Text :

Cause . . . . . : The following may have caused the problem:
-- A not valid parameter was used when starting the communications subsystem control program.
Recovery . . . : Press F14 to run problem analysis.
Technical description . . . . . . . . : This message is reported when CRS received an inbound frame with a not valid Major Vector length.

- Processor Resource ....: &26
- Adapter Resource ......: &27
- Port Resource .........: &28

Message File : QCPFMSG
Library Message File : QSYS2924


ABAP Short Reference   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by IBM.

Length: 3210 Date: 20240423 Time: 235513     sap01-206 ( 3 ms )