SOP: Opening Stock Levels
Description
In Release 2.2, you could set the stock levels at the start of the planning horizon manually. This function is still available to you in standard SOP.
In Release 3.0, you also have several ways to set opening stock levels:
- you set them manually in the zero column of the planning table
- you generate them in one of three ways using mass processing
Setting Stock Levels Manually in the 0 Column of the Planning Table
You can use this function in flexible planning to set an initial value not only for the key figure "stock level" but for any other key figure. The "zero column" represents simply the time prior to the first period in which planning data is maintained.
Generating Stock Levels with Mass Processing
You can use SOP's mass processing function to set opening stock levels in any
Three methods of determining opening stock levels are available to you:
- average stock
- The average stock level over a specified period of time is set as the initial stock level.
- current stock
- The current stock level is set as the initial stock level.
- self-defined
- You create your own method in Customizing.
For more information on mass processing, see SOP: Mass Processing.
Effects on Customizing
You create your own method for setting opening stock levels in Define user methods.
Changes to the Interface
To set a value in the zero column of the planning table, you access the planning table from the Planning menu of flexible planning and select the pushbutton 0 column.
To generate opening stock levels with mass processing, you select Mass processing -> Opening stock levels from the Planning menu.
PERFORM Short Reference TXBHW - Original Tax Base Amount in Local Currency
This documentation is copyright by SAP AG.
Length: 2752 Date: 20240328 Time: 214935 sap01-206 ( 44 ms )