Calculation of Variances on the Basis of Modified Standard Cost Estimate ( RELN40A_COPCOBJ_SOLLV3 )
PERFORM Short Reference SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3upThis documentation is copyright by SAP AG.
Short text
Calculation of Variances on the Basis of Modified Standard Cost Estimate
Description
To improve your cost management of period costs, in Release 4.0A you can calculate the production variances of the period. To do this, you run a modified standard cost estimate each month and calculate the variances using the target costs calculated with the modified standard cost estimate and the actual lot size of the period.
The target costs calculated for the period in this way are compared with the control costs (in this case the net actual costs of the period).
Damage caused to data by errors
Software/hardware requirements
Installation information
Effects on System Administration
Effects on Customizing
The standard system enables the calculation of periodic variances on the basis of the modified standard cost estimate with target cost version 3.
See also:
Effect on batch input
Changes to the Interface
Changes in procedure
Procedure for removing dataset errors
Dependent functions
Planning
Further notes