Calculation of Variances on the Basis of Modified Standard Cost Estimate ( RELN40A_COPCOBJ_SOLLV3 )

Calculation of Variances on the Basis of Modified Standard Cost Estimate ( RELN40A_COPCOBJ_SOLLV3 )

PERFORM Short Reference   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Calculation of Variances on the Basis of Modified Standard Cost Estimate

Description

To improve your cost management of period costs, in Release 4.0A you can calculate the production variances of the period. To do this, you run a modified standard cost estimate each month and calculate the variances using the target costs calculated with the modified standard cost estimate and the actual lot size of the period.

The target costs calculated for the period in this way are compared with the control costs (in this case the net actual costs of the period).

Damage caused to data by errors

Software/hardware requirements

Installation information

Effects on System Administration

Effects on Customizing

The standard system enables the calculation of periodic variances on the basis of the modified standard cost estimate with target cost version 3.

See also:

Effect on batch input

Changes to the Interface

Changes in procedure

Procedure for removing dataset errors

Dependent functions

Planning

Further notes