Ansicht
Dokumentation
Date Control on a Costing Variant Level ( RELN40A_COPC_DATECONTROL )
CPI1466 during Backup CL_GUI_FRONTEND_SERVICES - Frontend ServicesThis documentation is copyright by SAP AG.
Short text
Date Control on a Costing Variant Level
Description
Until now, the date control has been linked to the costing type. From Release 4.0, the date control is linked to the costing variant.
Damage caused to data by errors
Software/hardware requirements
Installation information
Effects on System Administration
Effects on Customizing
The date control keys, which were previously assigned to their costing types, are now assigned automatically to the corresponding costing variants.
In Customizing for Product Cost Planning, make sure that the date control is assigned to the following costing variants:
In Customizing for Cost Object Controlling, make sure that the date control is assigned to the following costing variants:
Effect on batch input
Changes to the Interface
Changes in procedure
Procedure for removing dataset errors
Dependent functions
Planning
Further notes
Further information is available in the Implementation Guide to Product Cost Controlling and in the R/3 library documentation.
CPI1466 during Backup CPI1466 during Backup
This documentation is copyright by SAP AG.
Length: 2065 Date: 20240419 Time: 224929 sap01-206 ( 27 ms )