Ansicht
Dokumentation

Date Control on a Costing Variant Level ( RELN40A_COPC_DATECONTROL )

Date Control on a Costing Variant Level ( RELN40A_COPC_DATECONTROL )

CPI1466 during Backup   CL_GUI_FRONTEND_SERVICES - Frontend Services  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Date Control on a Costing Variant Level

Description

Until now, the date control has been linked to the costing type. From Release 4.0, the date control is linked to the costing variant.

Damage caused to data by errors

Software/hardware requirements

Installation information

Effects on System Administration

Effects on Customizing

The date control keys, which were previously assigned to their costing types, are now assigned automatically to the corresponding costing variants.

In Customizing for Product Cost Planning, make sure that the date control is assigned to the following costing variants:

In Customizing for Cost Object Controlling, make sure that the date control is assigned to the following costing variants:

Effect on batch input

Changes to the Interface

Changes in procedure

Procedure for removing dataset errors

Dependent functions

Planning

Further notes

Further information is available in the Implementation Guide to Product Cost Controlling and in the R/3 library documentation.






CPI1466 during Backup   CPI1466 during Backup  
This documentation is copyright by SAP AG.

Length: 2065 Date: 20240419 Time: 224929     sap01-206 ( 27 ms )