Ansicht
Dokumentation

Structural Changes to the IMG for Product Cost Planning ( RELN40A_COPC_PCP_IMG )

Structural Changes to the IMG for Product Cost Planning ( RELN40A_COPC_PCP_IMG )

ROGBILLS - Synchronize billing plans   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Structural Changes to the IMG for Product Cost Planning

Description

The following activities and sections were added:

(Under Basic Settings for Costing Materials)
(Unter Cost Estimate with Quantity Structure)
(Under Reference and Simulation Costing

The following sections were revised:

(Under Basic Settings for Costing Materials)
(Unter Reference and Simulation Costing)

The following activities were moved:

  • You can find all the activities for the information system under Product Cost Controlling -> Information System.
  • Message Types for Standard Cost Estimate, Define Indicator for Relevancy to Costing and Define Price Factors can be found under the new section Price Update.
  • Define Error Search is situated under Cost Estimate with Quantity Structure -> Error Management.
  • Activate Cross-Company Costing and Activate Cost Component Split in Controlling Area Currency can be found under Special Processing in Material Costing.
  • Check Costing Variant is situated under Basic Settings for Costing Materials as Check Settings.

The following sections were moved:

  • Error Management can be found under Cost Estimate with Quantity Structure -> Error Management.

The following sections were renamed:

  • Product Costing is now called Product Cost Planning
  • Basic Settings for Product Costing is now called Basic Settings for Costing Materials
  • Product Cost Estimate with Quantity Structure is now called Cost Estimate with Quantity Structure
  • Product Cost Estimate Without Quantity Structure is now called Cost Estimate Without Quantity Structure
  • Base Object Costing is now called Reference and Simulation Costing

The following activities were renamed:

  • Check costing variants is now called Check Settings
  • Define condition records for message control is now called Define Message Control
  • Develop enhancements for product costing is now called Develop Enhancements for Material Costing

The following section was deleted:

  • Utilities for product costing
The activities belonging to the section were moved.

Damage caused to data by errors

Software/hardware requirements

Installation information

Effects on System Administration

Effects on Customizing

Effect on batch input

Changes to the Interface

Changes in procedure

Procedure for removing dataset errors

Dependent functions

Planning

Further notes

Information about the structure of the Product Cost Controlling component can be found in the separate Release Info.






Fill RESBD Structure from EBP Component Structure   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.

Length: 5528 Date: 20240420 Time: 122606     sap01-206 ( 49 ms )