Valuation Variant for Work in Process and Scrap ( RELN40A_COPC_PRODCO_WIP )
RFUMSV00 - Advance Return for Tax on Sales/Purchases ROGBILLS - Synchronize billing plansThis documentation is copyright by SAP AG.
Short text
Valuation Variant for Work in Process and Scrap
Description
In Release 4.0A you can control the valuation of work in process (WIP) and scrap.
You can choose between the following valuations:
- Valuation at planned costs / costs of the version-specific cost estimate
- Valuation on the basis of an alternative cost estimate for the material, such as a modified standard cost estimate
- Valuation on the basis of the standard cost estimate
- In this case the standard cost estimate is the following:
- In make-to-stock production, the standard cost estimate is the standard cost estimate for the material.
- In sales-order-related production with a valuated sales order stock, the standard cost estimate is the cost estimate for the collective requirements material upon which the standard price calculation is based, or a cost estimate selected on the basis of a predefined strategy sequence.
- You control this in Customizing for Product Cost by Sales Order in the requirements class.
Damage caused to data by errors
Software/hardware requirements
Installation information
Effects on System Administration
Effects on Customizing
You define the valuation variant for work in process and scrap in Customizing for Product Cost by Period or Product Cost by Order.
To valuate the work in process at target costs, assign the valuation variant to results analysis version 0 in combination with results analysis key and controlling area.
To valuate scrap, you then specify the valuation variant in target cost version 0.
See also Define valuation variant for work in process and scrap (target costs)
Effect on batch input
Changes to the Interface
Changes in procedure
Procedure for removing dataset errors
Dependent functions
Planning
Further notes
For more information on the valuation variant for WIP and scrap, see the Implementation Guide.
For more information on the valuation strategy with a valuated sales order stock, see the document Cost Object Controlling.
CL_GUI_FRONTEND_SERVICES - Frontend Services RFUMSV00 - Advance Return for Tax on Sales/Purchases
This documentation is copyright by SAP AG.
Length: 4054 Date: 20240424 Time: 043711 sap01-206 ( 48 ms )