Sales Order Costing with Static Assembly Processing ( RELN40C_COPCOBJ_MONTAGE2 )
BAL_S_LOG - Application Log: Log header data BAL_S_LOG - Application Log: Log header dataThis documentation is copyright by SAP AG.
Short text
Sales Order Costing with Static Assembly Processing
Description
In Release 4.5A in static assembly processing with manufacturing orders, you can specify in the requirements class whether:
- The planned costs calculated on the basis of a preliminary cost estimate for the manufacturing order should be transferred, or whether
- A sales order cost estimate can be created
Up to now, in assembly processing 2 it was not possible to create a sales order cost estimate - the system always transferred the planned costs of the manufacturing order into the SD conditions.
In Release 4.5A you can create a sales order cost estimate with assembly processing 2 and transfer it into the SD conditions.
Examples of when you might want to create a sales order cost estimate with assembly type 2:
- When the costing method product costing is used for a sales order cost estimate, the system creates a cost component split, while there is no such split for the preliminary cost estimate of a manufacturing order (with manufacturing orders the system only displays a cost component split dynamically for informational purposes).
- The transfer of a cost component split that is based on a sales order cost estimate to Profitabilty Analysis (CO-PA) is useful when you are using a valuated sales order stock and the standard price is based on the sales order cost estimate (see also: Val. strategy).
- The control parameters for the transfer of a cost component split that is based on asales order cost estimate are in Customizing for Profitability Analysis under: Define access to material costing.
- When you use a nonvaluated sales order stock preliminary costing of an assembly order does not supply the complete planned costs. To get the complete planned costs, you can create a sales order cost estimate and transfer it to the conditions.
Damage caused to data by errors
Software/hardware requirements
Installation information
Effects on System Administration
Effects on Customizing
You make the required settings in the requirements class with the Copy cost estimate indicator.
See also: Check Requirements Class
Effect on batch input
Changes to the Interface
Changes in procedure
Procedure for removing dataset errors
Dependent functions
Planning
Further notes
With assembly types 1, 3, and 4 you can always create a sales order cost estimate.
For detailed information on the valuated and nonvaluated sales order stock, refer to the document Product Cost by Sales Order.
PERFORM Short Reference Addresses (Business Address Services)
This documentation is copyright by SAP AG.
Length: 4090 Date: 20240420 Time: 085652 sap01-206 ( 63 ms )