Changes in takt time scheduling/rate-based scheduling ( RELN40C_PP_CRP_TAKTTERMI )
ABAP Short Reference CPI1466 during BackupThis documentation is copyright by SAP AG.
Short text
Changes in takt time scheduling/rate-based scheduling
Description
In takt time scheduling/production-rate scheduling in sequencing the system calculates planned order dates (basic dates, production dates and component dates). Until now these have been overwritten by the dates calculated in lead time scheduling.
As of Release 4.5A you can specify that the planned order dates determined in takt time scheduling and rate-based scheduling determine the dates used, that is, lead time scheduling does NOT overwrite the dates calculated in takt time scheduling/rate-based scheduling. You make these settings in Customizing for Scheduling parameters for planned orders with the indicator takt time-/rate-based scheduling. Also the basic dates of the planned order are not adjusted as a result of lead time scheduling or finite scheduling. Lead time scheduling only serves to calculate the capacity requirements and their dates.
BAL_S_LOG - Application Log: Log header data rdisp/max_wprun_time - Maximum work process run time
This documentation is copyright by SAP AG.
Length: 1266 Date: 20240418 Time: 050955 sap01-206 ( 28 ms )