New Functions in Unit Costing ( RELN45A_COPCPCP_EINZEL )
PERFORM Short Reference General Material DataThis documentation is copyright by SAP AG.
Short text
New Functions in Unit Costing
Description
The following new functions are now available in unit costing:
- New reference objects of unit cost estimates
- The previous reference object for unit cost estimates in the project system was the WBS element. In Release 4.5A you have two additional reference objects: general costs activities and material components.
-
With unit costing you can now plan your costs in more detail in earler planning stages. This is an advantage
when you want to use unit costing for order costing, because potential buyers generally expect a quotation at a very early stage.
- Printing
-
When you print a unit cost estimate, the system takes you to the cost component split where you can use the functions of that report.
- Costing raw materials
-
In cost estimates without a quantity structure and in preliminary cost estimates for sales order items,
you can use the function of raw material costing. If you choose Functions -> Raw
material cost estimate -> Switch on/off in the list screen of the unit cost estimate, the system costs the raw material and enters an item of category I.
See also: Costing raw materials
- Indicator: Price changed manually
-
You can manually change the value of a costing item. The indicator Price entered manually indicates whether the price for the item was entered by a user or selected by the system.
- Sums
-
In unit costing you can have the system calculate a sum of all items that are not hidden when the filter is set.
- Indicator: Do Not Determine Item Value via Cost Component Split
-
In cost estimates without a
quantity structure you can determine for each costing item whether the price is taken from an existing cost component split or whether the system uses a price from the material master.
- Multiple Valuation Views
- In unit costing (base object cost estimates, preliminary cost estimates for sales order items) you can update costing results to multiple valuation views. You specify which valuation view you want to cost in the costing type in Customizing. You then enter this costing type in the costing variant with which you cost the base planning object.
Damage caused to data by errors
Software/hardware requirements
Installation information
Effects on System Administration
Effects on Customizing
Effect on batch input
Changes to the Interface
Changes in procedure
Procedure for removing dataset errors
Dependent functions
Planning
Further notes
For detailed information on unit costing (cost estimates without quantity structure, additive cost estimates, and reference and simulation costing), refer to the R/3 Library under Product Cost Planning.
For detailed information on unit costing and on general costs activities on the material component, refer to the R/3 Library under Project System.