Ansicht
Dokumentation

Renaming of indicator <font style="font-style:italic">Cost transfer</font> to <font style="font-style:italic">Sales order costing</font> ( RELN46C_COPCOBJ_KAUFKALK ) Cost transfer to Sales order costing ( RELN46C_COPCOBJ_KAUFKALK )" /> Cost transfer to Sales order costing ( RELN46C_COPCOBJ_KAUFKALK )" />

Renaming of indicator Cost transfer to Sales order costing ( RELN46C_COPCOBJ_KAUFKALK )

General Data in Customer Master   BAL_S_LOG - Application Log: Log header data  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Renaming of indicator Cost transfer to Sales order costing

Use

In Customizing for sales order controlling, the indicator Cost transfer was renamed Sales order costing during the requirements classes check.

This indicator controls whether sales order costing can be set up with assembly processing (assembly type 2).

If the sales costing indicator is set, sales order costing can be set up. If the indicator is not set, sales order costing cannot be set up. In this case, the planning costs that are determined for the production order are transferred into the SD conditions. Note: In this case, no cost component split can be sent to CO-PA if you are working with the valuated sales order stock.

Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

Further Information






BAL_S_LOG - Application Log: Log header data   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.

Length: 1230 Date: 20240419 Time: 032423     sap01-206 ( 19 ms )