Ansicht
Dokumentation
Project Risk Management for Plant Engineering and Construction (New) ( RELN470E2_CA_JVA_PRC )
SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up Vendor Master (General Section)This documentation is copyright by SAP AG.
Short text
Project Risk Management for Plant Engineering and Construction (New)
Use
As of SAP R/3 Enterprise Extension 2.0 (EA_APPL200), you can use the Project Controlling and Risk Management in Plant Engineering and Construction (CA-JVA-PRC) component to evaluate key figures across projects for individual organizational units. The joint venture serves as a pseudo level, at which the key figures are collected.
The following functions are available:
- Master data processing of joint venture data
- Projects are assigned to the affected organizational units, such as departments, divisions, and branches, using Joint Venture Accounting(CA-JVA).
- The joint venture is assigned to the project or individual WSB elements. The organizational units are shown as joint venture partners. The division of a project among the various departments or branches is reflected in the partner shares of the joint venture. The assignment is made independent of a time variable because the assignment can change over time.
- Data is stored in joint venture subledger accounting. This means that in addition to costs and revenue gained, you can also get information on, for example, receivables, payables, payments, and taxes.
- When the equity relationships in the joint venture change, the corresponding movement data must be adapted to the new equity shares. You can use Change Management to do this.
- Project-oriented enterprise structure
- You can use the following functions to link the organizational structure with the projects. You set up this link by assigning joint venture partners to organizational units.
- You can use the report painter for reporting key figures at project level.
- There are extractors for performing evaluations in SAP BW.
Effects on Existing Data
The Joint Venture Accounting (CA-JVA) component provides many subsequent processes that are not necessary for project and risk management of plant engineering and construction. If you use the CA-JVA-PRC component, these subsequent processes are not supported.
Effects on Data Transfer
Effects on System Administration
Effects on Customizing
You have to make various Customizing settings by choosing Joint Venture Accounting -> Project Risk Management for Plant Engineering and Construction.
Further Information
SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up rdisp/max_wprun_time - Maximum work process run time
This documentation is copyright by SAP AG.
Length: 3301 Date: 20240329 Time: 011601 sap01-206 ( 71 ms )