Ansicht
Dokumentation
APO-OPT-PPS: Total Lead Time for the Follow-Up Optimization ( RELNAPO_30A_SP1_OPT-PPS2 )
BAL Application Log Documentation rdisp/max_wprun_time - Maximum work process run timeThis documentation is copyright by SAP AG.
Short text
APO-OPT-PPS: Total Lead Time for the Follow-Up Optimization
Use
Up until now, you could specify by using the indicator Backward scheduling in the optimization profile on the tab page Additional strategies, that the system should execute a follow-up optimization when the actual optimization is completed. During the follow-up optimization, the system tries to schedule the operations that were scheduled too early as close as possible to the requirement dates; that is, it executes a form of backward scheduling.
As of Release 3.0A, you can specify on the tab page Additional strategies in the optimization profile that the total lead time achieved during the optimization should not be increased during the follow-up optimization. (The total lead time is the time difference between the start of the first activity in the optimization horizon and the end of the last activity in the optimization horizon).
SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up General Data in Customer Master
This documentation is copyright by SAP AG.
Length: 1102 Date: 20240420 Time: 054128 sap01-206 ( 32 ms )