Ansicht
Dokumentation
Introduction of the "Consider Campaign Requirements" Indicator in the Strategy Profile (New) ( RELNAPO_310_PPS_PCM4 )
ABAP Short Reference CPI1466 during BackupThis documentation is copyright by SAP AG.
Short text
Introduction of the "Consider Campaign Requirements" Indicator in the Strategy Profile (New)
Use
As of SAP APO 3.1, you can set the Consider Campaign Requirements indicator in the strategy profile on the General Strategy Parameter tab. By doing so, you specify that the following campaign requirements are taken into account when scheduling orders and operations:
- The campaign that is dispatched at the same resource must be uninterrupted, this means that the orders of a campaign must not be interrupted by orders that do not belong to this campaign.
- The setup order must be at the beginning of the campaign and the clean-out order must be at the end.
The system only checks the above campaign requirements for resources if the following indicators are set at the same time:
- The Campaign-Relevant indicator in the resource master
- The Consider Campaign Requirements indicator in the strategy profile
Effects on Existing Data
Effects on Data Transfer
Effects on System Administration
Effects on Customizing
To set the Consider Campaign Requirements indicator, go to Customizing for SAP Advanced Planner and Optimizer and choose Supply Chain Planning -> Production Planning and Detailed Scheduling -> Detailed Scheduling Planning Board -> Maintain Strategy Profiles.
Further Information
For more information, see:
SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up
This documentation is copyright by SAP AG.
Length: 2397 Date: 20240329 Time: 154045 sap01-206 ( 35 ms )