Planning procedure

Use

Until now, you could control the planning of a product in Production Planning and Detailed Scheduling (PP/DS) by selecting one of the following planning procedures, specified by SAP, in the location product master:

  • Automatic planning immediately
  • Automatic planning in the planning run
  • Manual planning with availability check
  • Manual planning without availability check

In SAP APO 3.1 you can define PP planning procedures more flexibly in the customizing for Production Planning and Detailed Scheduling (PP/DS), and in the location product master you can specify which planning procedure should be used to plan a product.

In a planning procedure you specify which action the system should execute for each planning-relevant event when the event occurs. A planning-relevant event is, for example, a goods movement for a product or a change to the product master. For example, possible actions by the system are immediately calling up the product heuristic or creating a planning file entry; the system can then use net change planning to plan the product later in the production run. SAP delivers a selection of events and actions that can occur in production planning.

You can use the reuse mode in the planning procedure to define how the system should handle the existing receipt elements for the product when planning with the product heuristic (immediately or in the production planning run). For example, the system can use receipt elements to cover product requirements or it can delete existing receipt elements and create new ones. In the scheduling status field you specify with which scheduling status the system should create a planned order, and if the system should change the scheduling status of an in-house production order after the quantity has been changed.

In SAP APO 3.1 the four option fields for the planning procedure in the location product master are replaced by the new planning procedure field. SAP delivers default planning procedures that correspond to the old planning procedures (see table below). With an upgrade to SAP APO 3.1, the new planning procedure that corresponds to the old planning procedure is set automatically in the location product master. You can define user-specific planning procedures using keys A to Z. (Customer namespace.)

Previous planning procedures New default planning procedures
Manual planning with availability check 1
Manual planning without availability check 2
Automatic planning immediately 2
Automatic planning in the planning run 4

Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

Further Information

For more information, see the Implementation Guide (IMG) for Production Planning and Detailed Scheduling (PP/DS) under Maintain Planning Procedure.