Production Confirmation (Enhanced)

Use

In release SAP APO 4.0 the production confirmation will be enhanced with the following functions:

  • Changed Reporting Point Determination for Goods Receipt Posting
    Previously in the production confirmation with line-based production, goods receipts were posted with the confirmation at the last reporting point, for which the Post Goods Receipt indicator was set.

    In shop-floor-oriented repetitive manufacturing with iPPE it can be the case that several output nodes are assigned to different reporting points. For this reason, it is possible that several by-products can be assigned to several activities/reporting points. That is, goods movements can be posted at different reporting points.

    From SAP APO 4.0, the Post Goods Receipt indicator in the production confirmation is no longer considered.
    In the case of line-based production, it is not possible to assign output nodes to reporting points. The goods receipt is, therefore, always posted at the last reporting point on the line.
    When working with shop-floor-oriented repetitive manufacturing with iPPE, the goods receipt for an output node is always posted at the reporting Post Goods Movements and Activities indicator is set for this reporting point. If the indicator is not set for the reporting point, the goods receipt is posted at the next reporting point for which the indicator is set.
  • Cancel "with Reference"
    Using this new function you can cancel a confirmation with reference to an existing one. This new function is particularly useful if the original confirmation for a component or assembly was created with a variance. The function enables you to cancel all goods movements and activities generated for the confirmation.

Resetting the status of a planned order
Previously, planned orders could not be changed once they had been partially confirmed. Even if all the confirmed quantities had been reset, the status of the planned order remained partially confirmed.

If, using the new functions, you reset all confirmations for a planned order and confirm the quantity zero in each case, the overall status of the planned order is reset to initial. That is, the status is reset both at planned order level as well as at activity level.

  • Components for sales order stock without stock value segements
    If a production confirmation contains several components and/or activities that have to be processed, the Work in Progress (WIP) for the components and assemblies must also be updated during processing, and the goods movements must be executed. Previously, the confirmation could not be executed for components/assemblies, if a component has requirements for sales order stock, and no goods receipt has been posted.

    From this release, the processing will no longer be stopped and such components/assemblies will be saved for postprocessing (COGI in the DI system), even if no stock value segments exist.
  • iPPE master data
    The production confirmation supports product interchangeability, phantom assemblies, and by-products in iPPE master data. For further information, see the release information for these topics.


Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Effects on Customizing