Fill RESBD Structure from EBP Component Structure ABAP Short ReferenceThis documentation is copyright by SAP AG.
Short text
Incremental Optimization (Enhanced)
Use
In optimization-based planning in Supply Network Planning (SNP), you have the option of planning only a part of the model or planning on the basis of an already existing plan. This is called incremental optimization. The incremental optimization functionality has been enhanced in SAP APO 4.0.
Selecting Part of a Model
If you are only planning part of a model (by only choosing specific location products for instance), input products of the selected products defined in the production process model (PPM) or products that are available for procurement at a source location through a transportation lane might not be selected and are therefore not planned. Before now, neither input products nor source location products and their stocks were taken into account during planning.
As of SAP APO 4.0, you can specify that the SNP optimizer is to take into account the stocks of non-selected input products or source location products.
Basing on an Existing Plan
If you are planning on the basis of an already existing plan, the plan might be infeasible since the optimizer is not able to plan receipts for shortages that are the result of fixed orders from previous planning runs. To avoid this, it was already possible to specify that the dependent demand and distribution demand of fixed orders were to be treated in the same way as independent requirements; that is, that the optimizer would permit shortages but would calculate costs for not delivering. You can define these non-delivery costs in the product master data for the individual demand types: Customer demand, demand forecast, and corrected demand forecast.
As of SAP APO 4.0, you can also set that the optimizer is to regard the dependent demand and distribution demand of fixed orders and the stocks of unselected input products and source location products as a pseudo-hard constraint. This means that shortages are possible but penalty costs are to be calculated that are defined internally in the optimizer and are infinite. You use them to ensure that the optimizer will only permit shortages if it cannot find any other feasible solution.
Effects on Existing Data
Effects on Data Transfer
Effects on System Administration
Effects on Customizing
You can define the new options for incremental optimization on the Integration tab page within IMG activity Define SNP Optimizer Profiles.
Further Information
BAL_S_LOG - Application Log: Log header data SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up
This documentation is copyright by SAP AG.
Length: 2846 Date: 20240329 Time: 065042 sap01-206 ( 76 ms )