Ansicht
Dokumentation

PP/DS: Push Production ( RELNAPO_PPS_20A_PUSH )

PP/DS: Push Production ( RELNAPO_PPS_20A_PUSH )

SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up   General Material Data  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

PP/DS: Push Production

Scope of Functions

Push production allows you to plan a production process starting with an ingredient that is to be consumed.

Push production takes place in two steps:

  • Identification of a planning problem
  • Generation of a consumer for the available material

The most important tool for recognizing a planning problem is the Alert Monitor. It comprises alerts that refer to available material for which the system has no consumer.

You can call up push production from both the Alert Monitor and the product view (PP/DS). In the push production view, orders can be generated in the system that consume the available material. When these are scheduled, the availability of all other ingredients and production capacities is check simultaneously.

All generated orders are then created at the same time and can be discarded again if required.
The following support is available to the scheduler on the push production view:

  • Suggestions from the system for problem-solving
  • Simulations
  • Interactions
  • Links to the following applications so planners can analyze and process the orders generated
  • Alert Monitor

  • Product view

  • Production process model

  • Order processing

Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

Further Information






ABAP Short Reference   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by SAP AG.

Length: 2053 Date: 20240419 Time: 081124     sap01-206 ( 27 ms )