Ansicht
Dokumentation
BAdIs in Costing Environment for Customer-Specific Valuations (New) ( RELNBANKFSCM_500_BADI )
ROGBILLS - Synchronize billing plans Fill RESBD Structure from EBP Component StructureThis documentation is copyright by SAP AG.
Short text
BAdIs in Costing Environment for Customer-Specific Valuations (New)
Use
As of SAP ECC 5.00, Financial Services (EA-FS 500), in addition to the user exits already available within the costing process, you can use the following four Business Add-Ins (BadIs):
- BAdI prior tocalling fixed procedures
- BAdI aftercalling fixed procedures
- BAdI prior tocalling flexible procedures
- BAdI aftercalling flexible procedures
You can use these BAdIs together with the corresponding user exits at the same time (in parallel).
All BAdIs have the same method interface, and the same method. This allows for a uniform and complete structure within the costing process.
You can implement the BAdIs in Customizing for Profitability Analysisby choosing Tools-> Standard Profitability Analysis Enhancement-> Business Add-Ins in Costing Process.
Effects on Existing Data
Effects on Data Transfer
Effects on System Administration
Effects on Customizing
Further Information
TXBHW - Original Tax Base Amount in Local Currency ROGBILLS - Synchronize billing plans
This documentation is copyright by SAP AG.
Length: 1565 Date: 20240328 Time: 144146 sap01-206 ( 23 ms )