Ansicht
Dokumentation
/ATL/GENERAL028 - Base period Adjusment date was not given. report is terminated - /ATL/GENERAL 028
CPI1466 during Backup ABAP Short ReferenceThis documentation is copyright by SAP AG.
Diagnosis
You run a report which uses Adjusted data of Planned(Budget) expences.
therefor , the parameter 'Base Period Adjusment date'
must be given. in this case this parameter
was not supplied.
System Response
the system aborts the processing of this report and terminates execution.
Procedure
Please rerun the report and supply it with Base period parameter, or , run other report which do not use adjusted data
of Planned(Budget) expences.
CPI1466 during Backup CPI1466 during Backup
This documentation is copyright by SAP AG.
Length: 565 Date: 20240425 Time: 145527 sap01-206 ( 12 ms )