Ansicht
Dokumentation

/IPRO/MGT_BADI_ORDER - Define Element Ordering Sequence

/IPRO/MGT_BADI_ORDER - Define Element Ordering Sequence

General Material Data   BAL Application Log Documentation  
This documentation is copyright by SAP AG.
SAP E-Book

Implement this Business Add-In to determine if a clause should precede another during clause ordering.

The Business Add-In consists of the method described below, which can be used instead of the standard algorithm.

The following import parameters are provided:

  • IV_CLAUSE1
    First clause ID structure.
  • IV_CLAUSE2
    Second clause ID structure

The following returning parameters must be provided by your coding:

RV_CODE

Indicates whether the first clause should precede the second one during ordering ('X') or not ('').

By default, the system compares the values of all structure members of both clauses to determine the result.

After calling up the IMG activity, a dialog box appears, in which you can enter a name for the implementation.

If you have already made other implementations for this BAdI, another dialog box appears, in which the existing implementations are displayed. In this case, choose Create, and proceed as follows:

1. In the dialog box, enter a name for the BAdI implementation in the Implementation field, and choose Create.

The screen for creating BAdI implementations is now displayed.

2. Enter a short text for the implementation in the Short text for implementation field.

3. From the tab index, choose Interface.

The Name of implemented class field is already filled on the tab page, as a class name was automatically assigned to the implementation when you named it.

4. Save your entries, and assign the implementation to a development class.

5. Place the cursor on the method, and double-click to enter method processing.

6. Enter the coding for the implementation between the statements method ~ and endmethod.

7. Save and implement your coding. Return to the Edit Implementation screen.

8. Save the entries on the Edit Implementation screen.

Note: You can also create an implementation, and then activate it at a later time. In such a case, end the processing stage at this point.

9. Choose Activate.

The coding you stored in the methods will be run when the application program is executed.

For more information on using Business Add-Ins, see the SAP Library under Basis Components → ABAP Workbench (BC-DWB) → Changing the SAP Standard (BC) → Business Add-Ins.






General Material Data   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.

Length: 2677 Date: 20240424 Time: 152226     sap01-206 ( 38 ms )