Ansicht
Dokumentation

04287 - Upgrade 3.1i to 4.6c

04287 - Upgrade 3.1i to 4.6c

Fill RESBD Structure from EBP Component Structure   General Material Data  
This documentation is copyright by SAP AG.
SAP E-Book

Upgrade 3.1i to 4.6c


Jim

Model = S30
Processors = 8
Memory = 3.1G
Disks = 6607 3670M
6717 8589M
6717 7516G

total disk = 150G
OS = v4r5
from 3.11 to 4.6c

Years in Production = 3




Matt ,
Can you let su know how large the system was you used ( model, , number of
processors, type of disk, amount of memory etc.)

We are trying to get a feel for how long this whole process takes, and
where the upgrade takes the most time, so any information on length of time
on a given system would be very useful




[Non-text portions of this message have been removed]


Durban Tours - Südafrika Safari

ABAP Short Reference   PERFORM Short Reference  
This documentation is copyright by SAP AG.

Length: 1020 Date: 20240621 Time: 023504     sap01-206 ( 3 ms )