Recently I had an EarlyWatch session. In the report it stated that my
Journaling was in the same ASP as the Database and with this it slows down
updating and also if we had a crash I would loose all the days Journaling. I
was advised to change the ASP from ASP1 to ASP2. The following is procedure I
will be following, I would like you guys to take a look at this and advise if
there is a step that I'm missing or if this is the proper way:

ENDJRNPF FILE(*ALL) JRN(R3R<SID>DATA/QSQJRN)

CRTJRNRCV JRNRCV(R3<SID>JRN/QSQJRN01) ASP(2) THRESHOLD(50000)

CRTJRN JRN(R3<SID>DATA/QSQJRN JRNRCV(R3<SID>JRN/QSQJRN01)

Run AS4FIXFILE R3<SID>DATA

GRTOBJAUT OBJ(R3<SID>DATA/*ALL) OBJTYPE(*ALL) USER(R3OWNER)

If there is a step that I'm missing please advise because I will be doing this
to my PRODUCTION system and would like it to go as smoothly as possible.
Thanking you guys in advance.

Crosby Sinclair
SAP/AS400 System Administrator
Thomson Industries Inc.
Internet www.thomsonind.com
E-mail csinclairZt...
Phone (516) 944-1337
Fax (516) 883-8012


Durban Tours - Südafrika Safari

SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up   BAL Application Log Documentation  
This documentation is copyright by SAP AG.

Length: 1688 Date: 20240620 Time: 021754     sap01-206 ( 2 ms )