Message : CPA57B9
Controller &24 not ready. (C R)

Message Long Text :

Cause . . . . . : The probable causes are:
-- The power to the remote system is turned off.
-- The wrong number was called.
-- The remote system is not ready.
Recovery . . . : Do the following:
-- Have the remote operator verify that the remote system is ready.
-- Verify that the connection number (CNNNBR parameter) in the controller description is correct.
Then do one of the following:
-- Type C to cancel recovery and to inform any applications that are waiting for an operation that the recovery has been canceled.
-- Type R to try the operation one more time.
If the problem continues, press F14 to run problem analysis.
Possible choices for replying to message . . . . . . . . . . . . . . . :
C -- Cancel.
R -- Try again one more time.
Technical description . . . . . . . . : The error log identifier is &22.
The error code is &40: The system received a call progress signal (CPS) 46 from the X.21 network during a calling sequence. The remote system is signalling uncontrolled not ready (UNR).
CPS 46: The called subscriber is out of service.

Message File : QCPFMSG
Library Message File : QSYS2924


BAL Application Log Documentation   ABAP Short Reference  
This documentation is copyright by IBM.

Length: 3243 Date: 20240329 Time: 093321     sap01-206 ( 2 ms )