We are hiring and constantly growing! Have a look through our vacancies to find the right role for you!

CPD4102 - A sequence value to change multiple entries was not specified. ( OS/400 )

CPD4102 - A sequence value to change multiple entries was not specified. ( OS/400 )

Fill RESBD Structure from EBP Component Structure   ROGBILLS - Synchronize billing plans  
This documentation is copyright by IBM.
SAP E-Book


Message : CPD4102
A sequence value to change multiple entries was not specified.

Message Long Text :

Cause . . . . . : A sequence value must be specified on an initial constraint entry allowing the change multiple function to repeat the change for all constraints of the same sequence value group (1-99, *HLD) and status condition (RUN, HELD, etc.). The change is applied to all constraints following the selected constraint in the display list and having the same sequence value group and status condition as the selected constraint.
Recovery . . . : Enter a sequence value on an constraint with a value you wish repeated for all constraints that follow with the same sequence value group and status condition as the one selected.

Message File : QCPFMSG
Library Message File : QSYS2924


Fill RESBD Structure from EBP Component Structure   PERFORM Short Reference  
This documentation is copyright by IBM.

Length: 3244 Date: 20201021 Time: 174324     sap01-206 ( 22 ms )