Ansicht
Dokumentation
/FRE/BIF_BICONS_IMPORT - Initial transfer of consumption from BI
SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up CPI1466 during BackupThis documentation is copyright by SAP AG.
Purpose
The initial transfer of the consumption data from BI to SAP Forecasting and Replenishment (SAP F&R) provides a flexible and efficient way to retrieve the consumption data from the OLAP (online analytical processing) SAP BI system. By default, the initial transfer of the consumption data was retrieved from a SAP ERP system, PIPE (POS Inbound Processing Engine) or another OLTP (online transaction processing system) legacy system. The problem with those OLTPs is that the retention time of the data for the consumption data is very short, usually less than 1 month. Since typically more than two years of consumption data is needed in SAP F&R, data should be retrieved from BI. The consumption data stored in BI has usually a long period of retention.
Integration
Prerequisites
In order to use the initial transfer of consumption data from BI, you need to :
- have the consumption data already stored in a BI SAP system.
- have already defined the customizing of the Alternative provision of consumption
Features
Selection
Standard Variants
Output
Activities
Example
rdisp/max_wprun_time - Maximum work process run time BAL Application Log Documentation
This documentation is copyright by SAP AG.
Length: 1462 Date: 20240427 Time: 063105 sap01-206 ( 41 ms )