Ansicht
Dokumentation
CNV_CMIS_U_RFMXPA01 - Conversion Program for CIs FI-FM Rel. > = 4.5 -> IS-PS Rel. 4.62
ABAP Short Reference General Data in Customer MasterThis documentation is copyright by SAP AG.
Title
Conversion of commitment items (production data) with new installation on IS-PS 4.62
Purpose
When changing or installing a new industry-specific component
This converts the commitment items of FI-FM tables FMFPO, FMFCPO, FMHIPOS into IS-PS tables FMCI, FMCIT, FMHICI.
Prerequisites
The program is started automatically with the installation of IS-PS 4.62.
Features
- The program converts the commitment items from the old structures (FMFPO(T), FMFCPO(T), FMHIPOS) into the new structures (FMCI(T), FMHICI FMPOSIT and FMFXPO).
- With the account assignment item (FMFPO(T))only the last analysis period is converted.
- The commitment items are converted into the year-independent standard hierachy (variant 000).
- Entries in Customizing tables FMCIVARNT(T)are generated.
- The classification data in table INOB is converted. Customizing entries on classification in tables TCLA, TCLT, TCLTT, TCLO, TCLAO, TCLAX and TCLR are adjusted.
- The program processes all FM areas in all clients. For each client and FM area for every G_CON_SIZE_MAX (1000) records are converted; the converted data is indicated using field AZPKZ = G_CON_DONE (Y) in tables FMFPO u. FMFCPO.
- Long texts of commitment items in tables STXH, STXL and STXB are copied. This means that OLD as well as NEW exist.
- The program generates a log with the standard log interface.
- You can execute the program as often as you wish.
Output
If there is an error you will receive an error list.
Activities
If there is an error execute a manual error correction method and start the program again.
General Data in Customer Master Fill RESBD Structure from EBP Component Structure
This documentation is copyright by SAP AG.
Length: 2756 Date: 20240520 Time: 073915 sap01-206 ( 37 ms )