Ansicht
Dokumentation

DMC_RESET_FROM_DDIC_FLAG - reset "from ddic" flag from structures

DMC_RESET_FROM_DDIC_FLAG - reset "from ddic" flag from structures

Vendor Master (General Section)   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.
SAP E-Book

Purpose

This report can be used to reset the "from DDIC" flag from all structures of either the sender container, or receiver container, or both, of

  • a single conversion object
  • all conversion objects of a subproject
  • all conversion objects of a project

This can be necessary if the structures were first created from a DDIC reference and later, this DDIC reference doesn't exist any longer, e.g. the corresponding sender and receiver rfc destinations don't exist any longer

Integration

Prerequisites

Features

Selection

Standard Variants

Output

No list output; an application log is created

Activities

Example






Vendor Master (General Section)   PERFORM Short Reference  
This documentation is copyright by SAP AG.

Length: 999 Date: 20240531 Time: 080819     sap01-206 ( 21 ms )