Ansicht
Dokumentation
GM_BILLING_MASS_UNBLOCK - Remove Billing Block for Billing Plan
RFUMSV00 - Advance Return for Tax on Sales/Purchases ROGBILLS - Synchronize billing plansThis documentation is copyright by SAP AG.
Purpose
You can use this program to change the billing block on billing plans.
Integration
Prerequisites
First, configuration in Customizing is required. Choose Sales and Distribution -> Billing -> Billing Plan and carry out the appropriate steps.
- For Grant Master:
- Maintain a billing rule relevant for billing plan, a sales area, a WBS element (not relevant for resource-related billing (RRB)), total billing amount and installment amount (for periodic billing) in the Billing tab of the grant master data before the grant attains Award status.
- Only the following billing rule categories are relevant for the report:
- - RRB with billing plan
- - Milestone billing (pure)
- - Periodic billing (pure)
When the grant attains Award status, the billing plan dates and amounts can be maintained in the Grant Master. Choose Environment -> Billing Plan.
Features
The report uses the ALV (ABAP List Viewer) Grid with the standard features.
Selection
Stipulate the following:
- The range of grants for which you want to update the billing block status (required)
- The range of sponsors for which you want to update the billing block status (optional)
- The range of external references as given in the master data for the grants for which you want to update the billing block status
- The range of internal references as given in the master data for the grants for which you want to update the billing block status
- The billing date which corresponds to the last billing date for selecting the billing plan items
- The system defaults today's date, but you can overwrite this.
- The billing block status which is by default set to '02' and the value space is excluded.
- In Process Control:
- Whether this is to be a test run
Standard Variants
Output
The output structure of the ALV List is GMBILLING_PLAN and contains the following information:
- Grant (drilldown on Grant Master transaction (GMGRANTD) is possible)
- Sponsor
- Sales document (drilldown on sales document transaction VA03 is possible)
- Sales area
- Billing plan number (drilldown on billing plan detail is possible)
- Billing date
- Billing value
- Total grant value
- Billing block status
Billing plan dates already billed do not appear in the due list.
You can view the detailed error log using the appropriate button or by choosing Goto -> Error Log.
Activities
Example
ABAP Short Reference BAL_S_LOG - Application Log: Log header data
This documentation is copyright by SAP AG.
Length: 3702 Date: 20240531 Time: 113827 sap01-206 ( 39 ms )