Ansicht
Dokumentation

IUUC_PARALL_MASTER_CONTROLLER - Start data transfer in parallel to production (full incrementality)

IUUC_PARALL_MASTER_CONTROLLER - Start data transfer in parallel to production (full incrementality)

ABAP Short Reference   PERFORM Short Reference  
This documentation is copyright by SAP AG.
SAP E-Book

Purpose

This activity allows you to transfer data changes from the productive system to the upgrade system in parallel to the usage of the productive system.

This transfer is done in multiple repetitions. Therefore you need to specify in what time intervals the transfer jobs should be scheduled. You also need to specify the date and time for the last scheduling (choose a time well before the downtime of the hitherto productive system will start).

Concerning the number of jobs to be scheduled, please note that there are two options: In addition to the number of jobs you specify when starting this activity, you can also maintain table IUUC_REPL_JOB_NM, in order to change the number of jobs that should be scheduled depending on the time of the day.

Integration

Prerequisites

Features

Selection

Standard Variants

Output

Activities

Example






PERFORM Short Reference   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.

Length: 1152 Date: 20240531 Time: 193828     sap01-206 ( 28 ms )